Team and maintenance

Dedicated teams

A whole team with a lead that works only on your project, reports to the board on a fixed schedule and leaves with you everything needed to run the system.

Let's talk about your project See the scope

Scope

What clients come to us with

  1. Requirements will only become clear with the first version

    The board knows what the system should change in the company, but the departments cannot write down requirements a year ahead. Every version shown brings new comments and changes the order of work. A fixed-scope contract would mean an amendment after every such demonstration.

  2. Several contractors, each seeing only their own piece

    The company has hired a developer, a database specialist and an interface specialist separately. Each knows their own part, no one plans the whole and no one is responsible for the deadline. The board gathers the state of work from three conversations and pieces the picture together itself. When one person leaves, their part is left without anyone to look after it.

Scope

What we do

  1. A dedicated team is a team put together for your project that works only on it for the term of the contract. It includes an analyst, who works with your staff to write down what the system should do and turns that into tasks. It includes developers, who build the system, and a tester, who checks every change before it reaches users. And it includes a lead, who plans the team's work, keeps track of deadlines and answers to you for the result.

    We run the team: you set the goals and their order, and the lead turns them into a plan and assigns the tasks. Individual specialists who join your own team and report to your manager are a separate scope.

    We record the scope as goals for each billing period and as a task list in your tool. The team works in short cycles and shows a working part of the system after each one. In every period the board receives a written report: what has been built, what is in progress, what the risks are and how much of the budget has been used. At the meeting with a board member, the lead shows the working system.

    The team works in your systems, on accounts set up under your rules: with permissions limited to the project, a record of changes and access withdrawn at the end. The code, documentation, configurations and environments, meaning the servers on which the system runs and is tested, sit in your accounts from day one. The contract transfers to you the rights to everything that is created.

  2. When a dedicated team, and when a fixed-scope project

    A fixed-scope project is an order with a set scope, price and deadline that ends with acceptance of the finished system. It makes sense when the scope can be written down before the start and will not change along the way, and you want to know the price of the whole in advance. A dedicated team makes sense when the requirements will become clear along the way, when the order of work depends on the previous version, or when the project is a series of changes with no single end point. If the analysis shows that the scope is fixed, we propose a fixed-scope project.

    We bill the team's working time per billing period, at the role rates set in the contract. The budget for each period is fixed and known in advance, and you decide the scope within it. Changes to the team's make-up or ending the cooperation follow the notice period set in the contract. What gets built: successive working parts of the system, documentation written as the work goes on, and a task list that shows what is left.

Scope

What you get

    • A contract setting out the team by role, the lead on our side, and the rules for changing the team and for billing.
    • Working parts of the system after each cycle, checked by the tester and running at your company.
    • A report for the board in every period: what has been built, what is in progress, risks, budget used.
    • A closing record: code, documentation, environments and accounts in your hands, the team's access withdrawn.

Scope

How the work runs

    1. We agree the goal, the team and the rules. We write down what the system should change in the company, which roles are needed and who on your side makes decisions. Result: a contract with the team make-up, responsibilities, reporting schedule, and access and billing rules.
    2. We start the team. You set up accounts for the team under your rules, and the analyst writes down the first tasks with your staff. Result: a plan for the first period and a working part of the system after the first cycle.
    3. We work to a fixed rhythm. After each cycle we show what has been built, and you decide the order of further work. Result: successive parts of the system in use and a report for the board in every period.
    4. We close and hand over. We check that the code, documentation and environments are in your accounts, withdraw access and name who runs the system from then on. Result: the system, and everything needed to run it, with you. Maintenance of the system by our team, or a wider transfer of knowledge to your staff, are separate scopes.

Scope

Questions the board should ask a dedicated team provider

    1. Who runs the team day to day, and who on the provider's side answers to us for the results?
    2. What happens when a team member leaves mid-project: who replaces them, and who pays for bringing the successor up to speed?
    3. Where do the code, documentation and environments sit from day one, and who owns the rights to what is created?
    4. What does the board report contain, how often do we receive it, and will we see the working system at the meeting?
    5. How do we change scope or priorities along the way, and does that require an amendment to the contract?
    6. What access to our systems does the team need, who grants it and who withdraws it at the end?
    7. How much notice do we need to give to reduce the team or end the cooperation, and what do we receive then?
  1. Which model fits your project is shown by the process analysis we start with: it ends with a recommendation covering the scope and the way of working together.

Parent service

Team and maintenance

Engineers in your team for the duration of a project, or taking over system maintenance, ending with knowledge transfer to your people.

See the service

Book a meeting

Book a conversation about the problem

You describe the process or system that no longer keeps up and what has to change. The conversation costs nothing.

Pick a time

Phone: +48 455 406 404

Team and maintenance

Other scopes of this service

See the service: Team and maintenance

Skills augmentation

One missing role in your project filled by a person from our team, chosen in conversation with your people, working under your manager, with a replacement when needed.

See the scope

Taking over maintenance

A system built by someone else under ongoing care: reviewed before takeover, with a list of gaps, a plan for the first clean-up and a single queue for requests.

See the scope

Knowledge transfer

The system, its access and the knowledge of it in your people's hands, tested so that your team releases a new version and fixes a failure on its own, without calling the contractor.

See the scope

How we start

  1. A conversation about the problem

    You describe the process or system that no longer keeps up and what has to change. The conversation costs nothing.

  2. Analysis under an NDA

    We examine the process and the systems and hand over a recommendation with a scope of work. You know the scope, deadline and price of the analysis before it starts.

  3. Offer

    You receive the scope, team, schedule and price of the implementation. You decide whether we go ahead.

The cost of the analysis is credited towards the implementation if you order it.

Let's talk about your project

Phone: +48 455 406 404 E-mail: contact@aliaxit.com

© 2026 ALIAX IT sp. z o.o. · ul. Boczna 28, 64-115 Wilkowice · KRS 0001102190 · NIP 6972399808 Privacy policy ·