Technology advisory

Technology strategy

A direction for the company's systems over several years, written so that the board knows which systems stay, which are replaced, in what order and what it pays for.

Let's talk about your project See the scope

Scope

What clients come to us with

  1. The IT budget is a list of departmental requests

    Sales wants a new CRM, the warehouse a scanning module, finance more licences. The board has no criterion to show which request brings the company closer to its goals and which entrenches a way of working the company wants to leave behind. The department that asked loudest wins.

  2. The growth plan rests on systems from the previous stage

    The company is planning a new market, a second plant or more orders with the same team. Its systems date from when it was smaller. The question of whether they can carry the load comes up once the plan is already under way.

  3. Two suppliers, two opposite directions

    The ERP supplier proposes replacing everything with a new version. The implementation firm advises keeping the core and building modules alongside it. Both earn from what they propose. The board needs a view independent of both offers.

Scope

What we do

  1. A technology strategy is a written direction for the company's systems over several years: which stay, which are replaced, in what order, what the company does itself and what it buys. We set the horizon with the board. The starting point is the business goals the board already has: a new market, more orders with the same team, a merger of companies. We translate them into requirements for the systems: what the systems must be able to do by the end of the period for the goal to be achievable.

  2. Against that background every system gets a decision. It stays, because it carries a process the goals do not change. It stays after changes, because the limitation can be removed more cheaply than the system can be replaced. It is replaced, because it blocks a goal or the supplier is ending support. It is retired, because it duplicates another. A review of each system from the inside is a separate scope; the strategy uses its results or a description at the level the board needs.

  3. We put the decisions in order. Replacing a system that feeds others comes before them. A change that needs people from the previous implementation waits until that implementation ends. Contractors call the picture of the systems at the end of the period the target architecture and the order of steps a roadmap; in the strategy we describe both in plain terms. A detailed plan for a single implementation and a feasibility study of a single undertaking, a check of whether it can be done and at what cost, are separate scopes.

  4. The third part is the division of work. With its own people the company does what gives it an edge or concerns data it does not want to take outside. It buys a ready-made subscription service where one exists and is enough. It commissions a build when nothing ready-made exists. This division tells the board whom to hire and what contracts to look for.

  5. The result is a document the board uses to steer the budget: every IT expense either has its place in the strategy or does not, and the lack of a place is a signal to ask questions.

Scope

What you get

    • Business goals translated into requirements for the systems, confirmed by the board before further work.
    • A list of systems with a decision for each: stays, stays after changes, to be replaced, to be retired, with a justification in terms of goal and cost.
    • The order of changes for the whole period, with the dependencies between them and the order of magnitude of the cost of each step.
    • A division of work: what the company does itself, what it buys as a ready-made service, what it commissions to be built, with the criterion for the division.
    • Steering rules: criteria for assessing a new IT expense before it goes into the budget, and the circumstances that call for a review of the strategy.

Scope

How the work runs

    1. We set the goals and the horizon with the board. We discuss where the company wants to be in a few years and what has to change in how it works. Outcome: a list of goals translated into requirements for the systems, for your approval.
    2. We describe the systems in the board's language. For each: what process it carries, what it costs a year in licences, maintenance and people, and what limits it with respect to the goals. Outcome: a list of systems with cost and limitation.
    3. We take the decisions in a workshop with the board. Every system gets a decision, every change a place in the order, every piece of work an assignment: do it ourselves, buy, commission. Outcome: a draft strategy with justifications for discussion.
    4. We write up the strategy and the steering rules. The document is given a form the board can read without the IT department, together with instructions for using it when setting the budget. Outcome: a strategy ready for the board to adopt as the basis of the budget.

Scope

Team experience

  1. Members of the team implemented JIRA, a system for managing tasks and tickets, in the companies of a banking-sector group to one standard for the whole group. It is the same kind of choice a technology strategy records: what in the company should be shared, and from when.

Scope

Questions the board should ask the strategy contractor

    1. Which business goal does each decision about a system follow from, and where can we see that in the document?
    2. Which systems stay, which do we replace, and what happens if we postpone a replacement by a year?
    3. In what order should the changes go, and which of them blocks the others?
    4. What should the company do itself, what should it buy and what should it commission, and by what criterion was this divided?
    5. How is the board to use this document when setting next year's budget without the IT department at the table?
    6. Does the strategy contractor earn from the implementations it recommends, and how does it separate advice from sales?
    7. When does the strategy need a review, and who on our side should lead it?
  1. A direction for several years makes sense only against what holds the company back today, so the first step is an analysis of the process and systems, and the strategy grows out of its results.

Parent service

Technology advisory

An analysis of the process and the systems, ending with a recommendation and a scope of work: reorganise the process, connect the systems you have, or build a new one.

See the service

Book a meeting

Book a conversation about the problem

You describe the process or system that no longer keeps up and what has to change. The conversation costs nothing.

Pick a time

Phone: +48 455 406 404

Technology advisory

Other scopes of this service

See the service: Technology advisory

Systems diagnosis and review

A description of what your systems do today, what slows work down and what can be put to use, ending with a scope recommendation on which you can base the implementation decision.

See the scope

Feasibility study

An answer before a large expense: whether the planned system or automation can be built in the assumed time and budget, on what data and with what constraints.

See the scope

Technology due diligence

A report on the state of the systems, code, data, licences and IT team of the company you are buying, with the risks and the cost of putting things in order, before the deal is signed.

See the scope

Step-by-step implementation plan

Implementation stages arranged so that each one ends with something that works in the company, with the people on your side, the board's decisions and the conditions for moving to the next.

See the scope

How we start

  1. A conversation about the problem

    You describe the process or system that no longer keeps up and what has to change. The conversation costs nothing.

  2. Analysis under an NDA

    We examine the process and the systems and hand over a recommendation with a scope of work. You know the scope, deadline and price of the analysis before it starts.

  3. Offer

    You receive the scope, team, schedule and price of the implementation. You decide whether we go ahead.

The cost of the analysis is credited towards the implementation if you order it.

Let's talk about your project

Phone: +48 455 406 404 E-mail: contact@aliaxit.com

© 2026 ALIAX IT sp. z o.o. · ul. Boczna 28, 64-115 Wilkowice · KRS 0001102190 · NIP 6972399808 Privacy policy ·